Primary and backup pump
Phase 1 is manual, Phase 2 would add automation
Wastewater pipe loop with weather tight enclosure.
Photo of the top dome of an EQ tank at a brewery
PLC based control panel for lift station and pH adjustment built for us. UL and cUL certified.
Pumps are above grade for an underground tank, alternating with each pump cycle.
Two pipe loops for pH and discharge loops
A small, manual, above ground pH adjustment system
We come to you and install the equipment
at Odwalla in California